<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title"></title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="11/11/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="466,162,972,1094" />
         <classifier id="numcol" value="3"/>
      <classifier id="ArticleStyle" value=""/>
      <classifier id="Layer" value="Layer 1"/>
         <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Tue Nov 10 2026 21:10:52 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20261111T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST11112616MAI-SUPPLEMENT" position.sequence="16" ex-ref="DST11112616MAI-SUPPLEMENT.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	
       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
			</media>
</block>

     <p style=".Bodylaser" ul="0" ol="0"  orgstyle="INDENTLESS BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="INDENTLESS BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">At the meeting point of Gulshan, Tejgaon and Hatirjheel, Mirai is taking shape as a commercial tower that brings together Nordic architectural design, advanced construction technology and Nirman International’s civil engineering experience. Scheduled for handover by the end of 2027, the 30-storey development will rise to 138 meters, combining office spaces with corporate amenities and systems engineered to support the building throughout its working life.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Designed in collaboration with Finnish architectural practice ARCO, Mirai is defined by a copper-toned, unitized glass façade. Its restrained appearance is complemented by an emphasis on natural light, open interiors and protection from the noise and climatic conditions outside.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">For Rahat Kamal, Managing Director and CEO of Nirman, the priorities behind the project extend beyond its appearance. “When an enterprise commits to a landmark commercial address, three priorities lead the decision,” he says. “Strict schedule certainty to ensure a seamless move without costly delays, an intelligent and commanding architectural presence, and high performance infrastructure engineered to run for decades.”
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Bold" size="10">HIGH-TECH SYSTEMS AND INTELLIGENT WORKPLACE DESIGN</lang>
<lang  class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Visitors will enter through a tall, light-filled lobby, while an executive restaurant and an open-air terrace café overlooking the lake will provide spaces for dining and informal meetings. Destination-dispatch lifts coordinate movement throughout the tower.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Each office floor spans 12,200 square feet, with 12-foot clear ceiling heights and floor-to-ceiling double glazing contributing to a sense of openness. Advanced post-tensioned slab technology allows wider spans between columns, giving corporate tenants maximum flexibility across open-plan interior layouts.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">The façade is designed to reduce the intrusion of street noise, while multi-stage air filtration supports indoor air quality. Together, these features address the everyday experience of working in Dhaka, where the surrounding density and traffic can otherwise shape the office environment.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Stefan Ochsner is the Senior Architect at ARCO and the project’s lead architect. Working on a high-rise in Dhaka required attention to the city’s tropical climate, high humidity and urban conditions. The aim was to create a calm, light-filled interior supported by an exterior designed for performance as well as appearance.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Bold" size="10">COORDINATING DESIGN AND CONSTRUCTION
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Behind the finished spaces is a process that brings architectural and engineering decisions together before construction. Comprehensive Building Information Modelling, or BIM, coordinated the tower’s design before the physical structure took shape.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Structural elements, mechanical conduits and plumbing runs were mapped within a shared three-dimensional model. This digital discipline identified conflicts between systems early, preventing the on-site clashes that often delay complex high-rise projects. The post-tensioned floor slabs and structural core are also engineered to support the project’s target of LEED Gold certification.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Mirai’s structural and façade design underwent physical wind-tunnel testing in Italy. The testing formed part of the project’s rigorous assessment of how the tower responds to extreme wind forces, alongside the wider structural engineering process.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">These technical measures underpin the development’s emphasis on delivery and long-term performance. They also connect Nirman’s five decades of civil engineering experience with the requirements of a contemporary commercial building.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Bold" size="10">PLANNING BEYOND HANDOVER</lang>
<lang  class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Nirman’s plans for Mirai extend into the building’s operational life. A permanent in-house facilities management team oversees its upkeep, supported by automated building management systems that monitor and coordinate services including climate control and power continuity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">The approach recognises that a commercial address must continue to function reliably after construction is complete. For occupants, the quality of maintenance and the dependability of building services will remain part of the daily experience.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">“Whether an organization selects a corporate headquarters or a family purchases a home, they are securing a generational asset,” Kamal says. “Our responsibility is to ensure that long after handover, the asset continues to reflect the prestige of the enterprises operating within it.”</lang>
</p>

    </body.content>
  </body>
</nitf>