<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="433307" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="01/11/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="285,108,972,949" />
         <classifier id="Layer" value="Layer 1"/>
          <classifier id="numcol" value="4"/>
         <classifier id="ArticleStyle" value=""/>
       <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Sat Oct 31 2026 21:32:01 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20261101T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST01112606MAI-EDITORIAL" position.sequence="6" ex-ref="DST01112606MAI-EDITORIAL.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="[No Paragraph Style]" class="1" MainHead="true" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="[No Paragraph Style]" style="Headline1"  font="Antonia H1" fontStyle="Heavy" size="49">Rooppur’s first electricity will be a milestone, not the finish line</lang>
	</hl1>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="ImageOfFrame38802_6_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
<media-reference id="tn" source-credit="" data-location="1" source="ImageOfGroup42781_6_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
<media-reference id="tn" source-credit="" data-location="3" source="ED_1_Pabna_Roop_6_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser" ul="0" ol="0"  orgstyle="INDENTLESS BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="INDENTLESS BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">If everything goes as planned, Bangladesh will soon do something it has never done before: transmit electricity from a nuclear reactor to the national grid. News headlines will call it historic, and rightly so. But that moment will only be the visible tip of a long, carefully ordered process called commissioning. During this process, every structure, system, component, item of equipment, and safety system at Unit 1 of the Rooppur Nuclear Power Plant is tested, inspected, and approved before the reactor can begin trial electricity generation. Rooppur has two VVER-1200 Generation III+ reactor units, each with an electrical capacity of 1,200 MW. The commissioning of Unit 2 is expected to begin next year.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">There seem to be some misconceptions about Rooppur’s electricity generation and transmission, so it is important to understand how the commissioning process works. Commissioning does not end when electricity first reaches the grid, nor does it follow a political calendar. Understanding how the work proceeds can help readers distinguish routine pauses from genuine problems in the weeks ahead. The project’s contractual schedule divides the process into four stages, A to D, each with several sub-stages, followed by a guarantee period. The durations discussed below are planned figures, not actual elapsed times.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Stage A—pre-commissioning alignment—is the longest, accounting for 55 of the planned 68 months before commercial operation. Beginning with the first concrete pour for the Unit 1 reactor on November 30, 2017, it covers completing installations, training and licensing operators, testing every system individually and in combination, pressurising the containment building, and running the reactor circuit through cold and then hot (16.2 MPa, 329 °C) tests without fuel. The aim is to detect faults so they can be fixed inexpensively. Fuel for Unit 1 reached the site in October 2023 and has since been stored under International Atomic Energy Agency (IAEA) safeguards.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Stage B—physical start-up—began with fuel loading on April 28, 2026. The reactor is kept in a subcritical state while instruments and control rods are tested, then brought to first criticality: the start of a controlled, self-sustaining chain reaction at well under one percent of full power. Planned for two months, this stage took more than five in reality. Faults in the pressure-relief safety valves postponed regulatory approval until Russian specialists fixed them and the system passed high-pressure tests. Finally, the reactor reached criticality on October 11, 2026, and the minimum-power physical tests have since been completed.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Stage C—power start-up—has just begun after receiving regulatory approval from the Bangladesh Atomic Energy Regulatory Authority (BAERA). During this stage, heat generated by the reactor is used to produce steam, while the reactor’s thermal power is gradually increased in controlled steps. The process has already begun at five percent of the reactor’s rated power, with engineers progressively raising the output while closely monitoring the reactor instrumentation, cooling systems, turbine-generator synchronisation, and electrical transmission systems. Once the reactor safely reaches at least 30 percent of its capacity—a milestone expected in November/December 2026—sufficient steam will be available to drive the turbine-generator and begin trial electricity generation and transmission to the national grid. Initially, approximately 300 MW of electricity will be supplied against the unit’s 1,200 MW capacity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Stage D—pilot commercial operation—then runs for a planned ten months, testing the unit up to its full power, including at least three days of continuous full-capacity operation, with Bangladeshi operators working alongside Russian experts. A 12-month guarantee period follows. Theoretically, the whole sequence spans 80 months (six years and eight months). In practice, if Unit 1 connects to the grid in November/December, nine years will have passed since construction began.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">Grid connection is more than a switch-over. At 1,200 MW, Unit 1 is larger than any other power-generating unit supplying the national grid. If it trips suddenly, supply drops sharply and grid frequency falls, so the system must respond at once with spinning reserves or by shedding load to avoid a blackout. Nuclear plants run best at steady output, so other conventional plants must be flexible enough to follow daily swings in demand. The dependence also runs the other way: a reactor needs a reliable off-site power supply to keep its cooling systems running, even when shut down. Importantly, the electricity must be transmitted reliably from Rooppur to Dhaka and other major demand centres, such as Gazipur, Narayanganj and Chattogram, through dedicated high-voltage (400 kV) lines strong enough to carry it. If a line is congested or unreliable, or trips, the unit may have to cut its output. This could cause heavy economic losses.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">This matters because Bangladesh is in the middle of an energy crisis. This summer, load-shedding reached record levels, exceeding 3,600 MW at its peak in August as shortages of gas, LNG, coal and oil left power plants short of fuel, even though installed capacity exceeds demand. The weakness lies in fuel, not generating capacity. Domestic gas output is declining, and Bangladesh imports roughly two-thirds of its primary energy, so disruptions in global markets quickly result in power cuts at home while costly spot purchases strain public finances. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">What, then, can Rooppur realistically deliver? Once both units operate, their combined 2,400 MW would equal about one-seventh of recent peak demand of 16,000 to 18,000 MW, or roughly the amount of power lost to load-shedding this summer. Unit 1 alone would supply about half of that amount. This is significant, but it will not end load-shedding by itself. Output will be modest at first, and a full, reliable contribution from Unit 1 is unlikely before pilot operation ends, probably in the second half of 2027. If Unit 2 starts operating in 2028, less load-shedding should be needed thereafter. A sensible expectation, therefore, is a gradual contribution that eases pressure on the system, not a sudden end to outages. The benefit should become clearer over the next few years as Unit 2 joins and the grid learns to operate alongside nuclear power. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">What nuclear power offers is different in kind: steady, round-the-clock baseload supply; fuel delivered and stored in advance rather than bought cargo-by-cargo on volatile markets; and less dependence on fossil fuels. Realising these benefits will depend on matters beyond the reactor: a robust grid, secure fuel supply, loan repayment, a skilled workforce, a competent regulator, and long-term management of intermediate-level radioactive waste and spent fuel.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY 2025">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY 2025" font="Antonia H1" fontStyle="Medium" size="9">In short, we should not expect everything to change overnight. The first grid connection will be modest, brief pauses are normal during testing, and each step requires regulatory approval. So the proper test of Rooppur is not whether the first electricity reaches the grid on a promised day, but whether every stage is completed correctly and safely. Bangladesh will become the world’s 33rd country to generate nuclear power. Rooppur can strengthen our energy security, but only as one part of a wider remedy for the fuel, grid and finance problems behind today’s energy crisis.</lang>
</p>

    </body.content>
  </body>
</nitf>