<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="405988" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="13/05/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="520,656,788,1099" />
         <classifier id="Layer" value="Layer 1"/>
          <classifier id="numcol" value="1"/>
         <classifier id="ArticleStyle" value=""/>
       <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Wed May 13 2026 02:06:25 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260513T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST13052612MAI-BACK" position.sequence="12" ex-ref="DST13052612MAI-BACK.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="SHOULDER new" class="1" MainHead="false" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="SHOULDER new" style="Headline1"  font="Blacker Pro Display" fontStyle="Bold" size="15">ROOPPUR NUCLEAR POWER PLANT </lang>
	</hl1>
<hl2 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new 2" class="1" MainHead="true" style="Headline2">
		<lang class="3" colour="#000000" orgstyle="HEAD new 2" style="Headline2"  font="Blacker Pro Display" fontStyle="Bold" size="29">Fuel loading done ahead of schedule </lang>
	</hl2>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="rooppurpowerpla_12_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser" ul="1" ol="0"  orgstyle="BY NAME LINE new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Bold" size="8">OUR CORRESPONDENT, </lang>
<lang  class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Italic" size="7">Pabna
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="INDENTLESS BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="INDENTLESS BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">The nuclear fuel loading at unit-1 of the Rooppur Nuclear Power Plant (RNPP) has been successfully completed.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Rosatom, the main contractor of the plant, confirmed the development via an official press release last night.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">According to the statement, 163 fuel assemblies were loaded into the reactor core of unit-1. This is considered one of the most critical stages before the unit begins generating electricity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">​The fuel loading process officially began on April 28 and was completed within two weeks.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">​Alexey Deriy, vice president of Atomstroyexport (the construction authority for RNPP and a subsidiery of Rosatom), said the work was carried out in full compliance with the initial core loading programme, operational regulations, and international nuclear safety standards.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">​“The next stage includes the installation of the upper reactor unit and the integration of all required in-core instrumentation systems,” Deriy said. “Hundreds of additional tests will then be conducted to ensure the reliable and safe operation of all process systems.”
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">​According to Deriy, the reactor will soon be brought to its minimum controllable power level, followed by a gradual increase in capacity. These procedures will pave the way for the power startup and trial commercial operation of unit-1.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Soikat Ahmed, the media focal point officer for the plant, noted that while the loading process was originally expected to take one month, its early completion has accelerated the timeline. “If everything proceeds as planned, we expect to generate electricity from the unit by late July or early August.”
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">​The plant, Bangladesh’s first nuclear facility, is being built with Russian technical and financial assistance. The project features two VVER-1200 reactors with a combined capacity of 2,400MW. 
</lang>
</p>

    </body.content>
  </body>
</nitf>