<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="405299" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="11/05/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="219,425,487,785" />
         <classifier id="Layer" value="Layer 1"/>
          <classifier id="numcol" value="2"/>
         <classifier id="ArticleStyle" value=""/>
       <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Sun May 10 2026 22:13:54 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260511T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST11052609MAI-NEWS" position.sequence="9" ex-ref="DST11052609MAI-NEWS.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new" class="1" MainHead="true" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="HEAD new" style="Headline1"  font="Blacker Pro Display" fontStyle="Bold" size="25">Approach road cracks before bridge opening</lang>
	</hl1>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="Tangail_Picture_9_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser" ul="1" ol="0"  orgstyle="BY NAME LINE new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Bold" size="8">OUR CORRESPONDENT, </lang>
<lang  class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Italic" size="7">Tangail
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="INDENTLESS BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="INDENTLESS BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Even before a new bridge in Tangail’s Basail upazila could be inaugurated, cracks have developed on the approach road at one end, raising questions about the quality of work and materials used in the construction.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">The 70-metre bridge, built over a canal on the Saidampur Bazar-Kuratli road, connects residents of seven villages with the upazila headquarters.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">According to sources at the LGED in Basail, contractor Bashed Engineers was assigned to construct the bridge at a cost of Tk 4.5 crore. Work began in April 2021, with an initial deadline of one year. However, the project faced considerable delays and the deadline was extended several times. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">During a recent visit, cracks were seen on the approach road near Saidampur Bazar following incessant rainfall last week.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“The cracks appeared barely one and a half months after the road was constructed. Will the road remain usable if it rains for a few more days? It will likely collapse,” said Noni Gopal, a local.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Nur Nabi, manager of the contractor firm, said the approach road was constructed before Eid-ul-Fitr and the carpeting was done on new soil.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“Due to heavy rainfall recently and heavy traffic on the bridge, some parts of the road have developed cracks. Repairs will be carried out,” he said.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Contacted, Kazi Fattaur Rahman, upazila engineer in Basail, said the bridge work was still ongoing. “The area is low-lying and the soil is sandy, so the road surface likely could not hold up well following a downpour. The contractor will repair the cracks wherever they have appeared.”</lang>
</p>

    </body.content>
  </body>
</nitf>