<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title"></title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="405589" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="11/05/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="36,499,498,774" />
         <classifier id="numcol" value="3"/>
      <classifier id="ArticleStyle" value=""/>
      <classifier id="Layer" value="Layer 1"/>
         <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Mon May 11 2026 02:06:38 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260511T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST11052602MAI-NEWS" position.sequence="2" ex-ref="DST11052602MAI-NEWS.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new 2" class="1" MainHead="true" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="HEAD new 2" style="Headline1"  font="Blacker Pro Display" fontStyle="Regular" size="25">Tk 33,474cr Padma barrage set for govt nod </lang>
	</hl1>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
			</media>
</block>

     <p style=".Bodylaser" ul="0" ol="0"  orgstyle="FROM PAGE">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="FROM PAGE" font="Blacker Pro Display" fontStyle="Bold" size="7">FROM PAGE 1
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="INDENTLESS BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="INDENTLESS BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The barrage will feature 78 spillways, 18 undersluice gates, two fish passes, a navigation lock, guide bunds, and approach embankments.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">Hydropower plants will be set up at Padma barrage and Gorai off-take, which is the crucial entry point of the Gorai-Madhumati river. The plants will generate 113 megawatts of electricity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The first phase also includes the dredging and re-excavation of the 135.6km Gorai-Madhumati river and 246.46km Hisna river systems.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The other works include Gorai off-take with 15 spillways, fish pass, navigation lock, and hydro-power plant (36.6 megawatt); Chandana off-take (four spillways); Hisna off-take (five spillways); and construction 180km afflux bund.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The Hisna off-take, often referred to in conjunction with the Hisna-Mathabhanga river system in Bangladesh, is a critical component in water management designed to restore flow from the Ganges river system.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The off-take is part of wider efforts to combat silting and ensure water supply during the lean season, acting as a crucial channel for diverting water into regional rivers like the Hisna.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">However, activities under the first phase will directly benefit 19 districts and 120 upazilas in four divisions: Khulna (Kushtia, Meherpur, Chuadanga, Jhenaidah, Magura, Jashore, Narail, Bagerhat, Khulna, Satkhira), Dhaka (Rajbari, Faridpur, Gopalganj), Rajshahi (Pabna, Rajshahi, Natore, Naogaon, Chapainawabganj) and Barishal (Barishal, Pirojpur).
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The second phase includes construction of additional supportive infrastructure and restoration of Chandana-Barasia, Baral and Ichhamati river systems.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">Five river systems -- Hisna-Mathabhanga, Gorai-Madhumati, Chandana-Barasia, Baral and Ichhamati -- would be revived.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The revived river flows will reduce salinity intrusion in the southwest, restore biodiversity in the Sundarbans, and improve drainage and irrigation.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">It would ensure water supply to the Ganges-Kobadak (GK) Irrigation Project, the North Rajshahi irrigation project, Godagari pump house, and Rooppur nuclear power plant.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The project would ensure irrigation for 2.88 million hectares of net cultivable land and boost the annual production of rice by 2.39 million tonnes and fish by 2.34 million tonnes.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The idea of a barrage on the Padma dates back decades.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">Between 1960 and 2000, four studies were conducted to identify suitable sites. In 2005, a detailed feasibility study was launched, completed in 2013 by a consortium of local and foreign consultants.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.6">The study highlighted dry-season water scarcity due to upstream withdrawals at India’s Farakka Barrage, which has severely reduced flows in Bangladesh, drying up river systems and damaging agriculture, fisheries, navigation, and biodiversity.</lang>
</p>

    </body.content>
  </body>
</nitf>