<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="402486" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="22/04/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="337,190,842,1067" />
         <classifier id="Layer" value="Layer 1"/>
          <classifier id="numcol" value="3"/>
         <classifier id="ArticleStyle" value=""/>
       <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Tue Apr 21 2026 22:02:55 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260422T000000+5.30" edition.name="Business" edition.area="BUS" position.section="DST22042601BUS-Bizfront" position.sequence="1" ex-ref="DST22042601BUS-Bizfront.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new" class="1" MainHead="true" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="HEAD new" style="Headline1"  font="Blacker Pro Display" fontStyle="Bold" size="45">Mobile signals weaken as blackouts, fuel shortages spread </lang>
	</hl1>
<hl2 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="2ND HEAD new" class="1" MainHead="false" style="Headline2">
		<lang class="3" colour="#000000" orgstyle="2ND HEAD new" style="Headline2"  font="Blacker Pro Display" fontStyle="Regular" size="16">Telecom companies say nationwide connectivity is under  pressure as outages hit towers and data infrastructure </lang>
	</hl2>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="ImageOfFrame13538_1_BUS_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
<media-reference id="tn" source-credit="" data-location="1" source="ImageOfGroup13022_1_BUS_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser" ul="1" ol="0"  orgstyle="BY NAME LINE new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Bold" size="8">MAHMUDUL HASAN
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">In recent weeks, making a simple phone call has become a daily struggle for Md Mosharraf at Char Bahadurpur, a village at Phulpur upazila in Mymensingh district. For it, he blames prolonged power cuts.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“Nowadays, we get electricity for less than five hours a day. Once the electricity is gone, there is no network,” said Mosharraf. “I can’t even speak through my phone most of the time.”
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Currently, this problem is no longer limited to remote villages.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Mobile operators and tower companies say network quality has deteriorated over the weeks as power cuts have become more frequent and fuel supplies have worsened following the war in the Middle East.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">During power outages, operators depend on battery backups at tower sites. Most sites, however, have backup capacity for only four to six hours. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“When cuts last longer than that, there is no way to recharge the batteries,” said Shahed Alam, chief corporate and regulatory affairs officer at Robi Axiata.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Mobile operators then turn to generators. But only about 25 percent of towers are equipped with fixed generators, forcing many to depend on portable units.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“Adding insult to injury, we are not getting fuel supply to the towers and our critical data centres,” Alam said.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">There are 46,567 telecom towers across the country, operated by tower infrastructure companies and mobile operators. This provides network coverage to over 18.58 crore customers. Operators have around 27 data centres across Bangladesh.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Tower companies yesterday said that the fuel crisis could severely disrupt national connectivity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“Bangladesh’s connectivity ecosystem is facing a real and immediate threat,” said Sunil Issac, interim president of the Bangladesh TowerCo Association and country managing director of EDOTCO Bangladesh.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">He said telecom underpins all digital and economic activity and cannot be allowed to fail. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">“If the telecom sector is not prioritised within national energy allocation and fuel access frameworks, we risk a cascading failure that will impact businesses, essential services, and everyday life. Ensuring uninterrupted connectivity is no longer a sectoral concern; it is a national imperative,” he said.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Data collected by tower companies through remote monitoring sensors show that electricity availability at tower sites has dropped over the past month. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">In 12 districts, supply has fallen from 93 percent to 77 percent from the first week of March to the second week of April, according to tower company statistics.  
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">A tower company official said operators run thousands of towers nationwide and track power availability continuously.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Sunil Issac said, “We have engaged with the relevant authorities to outline the risks and propose immediate, practical solutions, including priority access to fuel and enabling policy support to help the sector navigate this challenging period.”
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">He said that given the scale of dependency on digital networks, proactive and coordinated action is essential.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">In recent weeks, mobile operators have sent at least two letters to the telecom regulator, saying an imminent nationwide disruption. The Association of Mobile Telecom Operators of Bangladesh said the electricity and fuel crisis has “reached a point where continued telecom operations can no longer be sustained without immediate government intervention.”
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">The association said prolonged outages have forced operators to run key infrastructure on diesel generators.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">According to the letters, base transceiver stations (BTSs) consume more than 52,000 litres of diesel and nearly 20,000 litres of octane each day across operators. Each data centre uses an estimated 500 to 600 litres of diesel per hour, or about 4,000 litres a day per facility.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Industry insiders say such reliance on backup power cannot continue for long. Unlike tower sites, data centres manage call routing and internet traffic. Any shutdown at that level could cause failures across the network.
</lang>
</p>

    </body.content>
  </body>
</nitf>