<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="400438" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="09/04/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="681,114,972,1093" />
         <classifier id="Layer" value="Layer 1"/>
          <classifier id="numcol" value="1"/>
         <classifier id="ArticleStyle" value=""/>
       <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Wed Apr 08 2026 21:11:57 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260409T000000+5.30" edition.name="Business" edition.area="BUS" position.section="DST09042604BUS-BIZBACK" position.sequence="4" ex-ref="DST09042604BUS-BIZBACK.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new 2" class="1" MainHead="true" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="HEAD new 2" style="Headline1"  font="Blacker Pro Display" fontStyle="Regular" size="34">Time to scale solar power is now </lang>
	</hl1>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="ImageOfGroup7541_4_BUS_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser" ul="1" ol="0"  orgstyle="BY NAME LINE new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Bold" size="8">TARIQ ALAM
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Solar power is often discussed as a policy ambition in Bangladesh, one which has become more pertinent given the ongoing global energy uncertainty and price volatility.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Bangladesh’s energy security depends on how quickly renewable ambitions translate into real projects -- spearheaded by solar.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Developing around 5,000 Megawatt peak (MWp) of solar could require over Tk 35,000 crore in generation investment, excluding land and supporting infrastructure -- making bankable projects and investor confidence essential. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">In Bangladesh, 1 MWp of solar capacity can generate roughly 1.4 million kilowatt-hour (kWh) annually, highlighting solar’s potential contribution to the national power supply.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">International experience shows that countries can scale solar from negligible levels to 20–30 per cent of installed capacity within a decade or even faster when supported by clear policy frameworks, bankable procurement structures and coordinated infrastructure planning.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Despite repeated policy commitments and long-term energy planning, solar deployment in Bangladesh has remained limited -- and this is solely because of an incomplete implementation framework.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">In several cases, projects were awarded without confirmed land access, grid interconnection or developers demonstrating the financial and technical capability required to deliver utility-scale projects. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">As a result, many projects lacked the capacity to achieve financial closure or progress to construction within expected timeframes. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Solar prices are influenced by technology costs but, in Bangladesh, are primarily driven by financing conditions, land constraints, infrastructure requirements and project risks. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">While concessional financing is available, the challenge is deploying it at scale. Lower financing costs require reducing project risk through bankable power purchase agreements (PPAs), strong payment security and credible project pipelines. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Institutions such as Infrastructure Development Company can play a role through blended finance and credit enhancement structures, particularly if scaled and aligned with utility-scale project requirements, while foreign exchange risk mitigation can help unlock international capital.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">The transition toward competitive solar tenders represents an important step forward. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Successful projects require key fundamentals from the outset. Developers should demonstrate secure land rights, confirm sites are dispute-free and obtain preliminary grid interconnection approval. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Financial capability should be supported by credible commitments from experienced institutions, with bid bonds and performance guarantees discouraging speculative participation. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Once a project is awarded, clear and enforceable timelines should govern each stage of development. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Power purchase and implementation agreements should be executed within three months of award, followed by financial closure withinsix months of PPA signing. Construction should then be completed within 12–18 months, depending on project size and site conditions.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Delays at any stage should trigger defined penalties, including encashment of performance guarantees. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Without disciplined timelines, projects risk remaining in prolonged development phases without progressing to construction. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Land and grid access remain two of the biggest barriers to scaling solar in Bangladesh. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Utility-scale solar is inherently land intensive: every 1,000 MWp of ground-mounted capacity typically requires roughly 2,200–2,300 acres. In a densely populated country, securing suitable sites becomes a major challenge. The ‘solar park’ model offers a practical solution. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Under this approach, government agencies prepare land and supporting infrastructure such as roads, drainage and substations before leasing plots to private developers. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">By addressing land and grid constraints upfront, solar parks can significantly reduce development risk, lower costs and accelerate project timelines. Targeted fiscal incentives can help accelerate investment during the early stages of solar expansion. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Policies such as tax holidays, reduced or zero import duties on solar modules, inverters and key balance-of-system components and accelerated depreciation for renewable energy assets can significantly lower capital costs. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Because much solar equipment is imported, such measures can materially improve project economics and support more competitive tariffs. Rooftop solar offers a fast-track pathway for expansion. Approximately 6,000 square metres of roof space can support around 1 MWp of solar capacity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Large factory rooftops provide suitable space for distributed generation, while net metering and third-party PPAs can enable deployment without upfront investment. 
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">As solar capacity grows, complementary technologies such as battery storage will help manage intermittency and support grid stability.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Bangladesh has both the demand and the opportunity to scale solar power rapidly. The challenge now is execution.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Italic" size="9">The author is a strategic consultant across technology, media and infrastructure industries</lang>
</p>

    </body.content>
  </body>
</nitf>