<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title"></title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="400148" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="07/04/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="509,739,972,1152" />
         <classifier id="numcol" value="3"/>
      <classifier id="ArticleStyle" value=""/>
      <classifier id="Layer" value="Layer 1"/>
         <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Tue Apr 07 2026 02:40:10 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260407T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST07042602MAI-NEWS" position.sequence="2" ex-ref="DST07042602MAI-NEWS.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new 2" class="1" MainHead="true" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="HEAD new 2" style="Headline1"  font="Blacker Pro Display" fontStyle="Regular" size="25">60% capacity of gas plants to stay unutilised </lang>
	</hl1>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
			</media>
</block>

     <p style=".Bodylaser" ul="0" ol="0"  orgstyle="FROM PAGE">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="FROM PAGE" font="Blacker Pro Display" fontStyle="Bold" size="7">FROM PAGE 1
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">As a result, officials forecast load shedding of around 2,000MW during peak hours, translating into two to three hours of outages nationwide.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">For the first time this year, there was 1,000MW of load shedding yesterday. The demand was 14,800MW.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Bold" size="8.5">CAPACITY CHARGE BURDEN
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">Local power plants operate under contracts with the PDB that guarantee a portion of payments to operators regardless of actual electricity generation, ostensibly against their investments.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">Inflated capacity charges in these deals have been costing Bangladesh up to $1.5 billion annually, according to a national committee formed during the interim government to review unsolicited contracts signed under the Awami League regime.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The committee warned that unless agreements with at least 41 plants are renegotiated, the country could face about $7.2 billion in excess payments over the remaining life of the deals.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">M Shamsul Alam, professor of electrical and electronic engineering at Daffodil University, said the service for which the plants were rented was never fully provided, with contractors and “dealmakers” benefitting at the people’s expense.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">He noted that underutilisation of plants is not solely linked to current geopolitical tensions, as coal supply is not dependent on the Strait of Hormuz.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">“Coal plants were utilised at only 45 percent capacity last year, though they were designed to run at 90 percent as baseload plants are designed to run continuously. If those plants operated properly, we could save Tk 25,000 to 30,000 crore annually by not having to buy liquid fuel,” he said.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Bold" size="8.5">GAS SHORTAGE
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The country requires around 3,825 MMcf/d of gas to meet the demand for power, industries, fertiliser, domestic consumers and non-grid power.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">However, as of yesterday, Petrobangla is supplying 2,650 MMcf/d, with 1,698 MMcf/d from local gas sources and 952 MMcf/d from imported liquified natural gas (LNG).
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">Domestic gas production has been in decline since 2018, when the local production was around 2,500 MMcf/d. Over the last couple of years, the country’s largest producing gas field, Bibiyana, has been producing less and less due to dwindling reserves.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Bold" size="8.5">COAL SCENARIO
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The PDB expects around 5,700MW of power from coal‑fired plants. The country has installed 6,203MW capacity across seven plants, alongside an agreement with Adani Power (Jharkhand, India) Ltd to import 1,496MW.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">As of yesterday, official data shows local plants were producing up to 4,100MW, while Adani Power supplied around 750MW.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">One of Adani’s two units was shut for maintenance, while the 1,200MW Matarbari plant was generating only 320MW due to coal shortages.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">In addition, all three units of the Barapukuria power plant, with a combined capacity of 524MW, were producing just 50MW because of technical issues, the records show.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Bold" size="8.5">FURNACE OIL
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The country has furnace oil‑based power plants with a capacity of 5,634MW, from which the PDB expects to generate up to 3,500MW this summer.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">At the evening peak (9:00pm) yesterday, furnace oil plants produced 2,800MW. These plants are typically operated only during peak hours, as furnace oil is the costliest source of fuel.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The situation is further complicated by mounting dues to power plants. Operators have warned they may not sustain production unless payments are cleared, raising the risk of deeper supply cuts.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Bold" size="8.5">RENEWABLES
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The country has installed 1,059MW of renewable capacity -- just 3.7 percent of the total -- with solar at 757MW, hydro 230MW and wind 62MW.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The 11 solar plants across the country support only daytime peak hours, providing up to 500MW and easing pressure on furnace oil plants.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The lone hydro facility at Kaptai operates at full capacity only during the monsoon, when water levels are high. During evening peak hours, 80MW is currently available from the hydro plant, with output fluctuating in line with water pressure, data shows.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="8.5">The country’s sole wind mill in Cox’s Bazar has an installed capacity of 60MW. Since output depends on wind speed, generation under current weather conditions is around 20MW, data also shows.
</lang>
</p>

    </body.content>
  </body>
</nitf>