<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="400148" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="07/04/2026" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="36,282,321,1102" />
         <classifier id="Layer" value="Layer 1"/>
          <classifier id="numcol" value="1"/>
         <classifier id="ArticleStyle" value=""/>
       <classifier id="Epaper-Build" value="7.1.5.2"/>
  <classifier id="ProcessingDateTime" value="Tue Apr 07 2026 02:36:47 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20260407T000000+5.30" edition.name="Dhaka Edition" edition.area="MAI" position.section="DST07042601MAI-FRONT" position.sequence="1" ex-ref="DST07042601MAI-FRONT.indd" />
  </head>
  <body boxBorderWeightColor="" boxBorderWeight="">
<body.head>
      <hedline>
    	<hl1 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="SHOULDER new" class="1" MainHead="false" style="Headline1">
		<lang class="3" colour="#000000" orgstyle="SHOULDER new" style="Headline1"  font="Blacker Pro Display" fontStyle="Bold" size="15">PDB’S SUMMER POWER PLAN </lang>
	</hl1>
<hl2 id="Headline1" ul="0" ol="0" ulColor=""  ulWeight=""  olColor=""  olWeight="" textFrameColor="" orgstyle="HEAD new" class="1" MainHead="true" style="Headline2">
		<lang class="3" colour="#000000" orgstyle="HEAD new" style="Headline2"  font="Blacker Pro Display" fontStyle="Bold" size="39">60% capacity of gas plants to stay unutilised </lang>
	</hl2>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="ImageOfGroup11608_1_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser" ul="1" ol="0"  orgstyle="BY NAME LINE new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BY NAME LINE new" font="Blacker Pro Display" fontStyle="Bold" size="8">ASIFUR RAHMAN
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="INDENTLESS BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="INDENTLESS BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">The government’s underutilisation of power plants is likely to worsen this summer due to shortages of gas, coal, and furnace oil caused by US-Israel war on Iran and financial constraints.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Around 40 percent of the overall capacity is expected to remain idle during peak demand between 7:00pm and 9:00pm. Gas‑fired plants are likely to be used the least.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Out of the total 12,204 megawatts (MW) of gas‑fired capacity, the Bangladesh Power Development Board (PDB) will be able to use at best 5,200MW, leaving nearly 7,000MW offline.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">This means about 60 percent of gas‑fired capacity may remain unutilised throughout the summer, while capacity charges will continue to be paid, according to the PDB’s summer plan.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Even yesterday, at least 17 gas-fired power plants, out of a total of 57, were either not running or producing less than their capacities due to gas shortages.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">To fully utilise the country’s gas‑fired power capacity, the PDB requires around 2,524 million cubic feet of gas per day (MMcf/d).
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">With the overall gas supply now at 2,650 MMcf/d, Petrobangla, the state‑owned supplier, must ration allocations to power plants, industries, fertiliser factories, and homes.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">An internal PDB analysis states that it needs at least 1,200 MMcf/d of gas to run power plants during the summer peak projected demand of 18,500MW, provided coal‑fired and furnace oil plants generate expected electricity.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Currently, gas supply to the power sector stands at 900 MMcf/d, allowing PDB to produce up to 5,200MW. The supply may drop further as the government has decided to restart at least two fertiliser factories.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">Gas shortages have already forced five of the country’s six fertiliser factories to remain shut since March. The lone running fertiliser factory -- Ghorashal‑Palash Urea factory -- needs 60 MMcf/d. In May, multinational KAFCO is expected to resume operations, requiring another 60 MMcf/d.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">The PDB analysis warned that if gas supply to power plants drops to 800 MMcf/d, electricity generation will drop below 4,500MW.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="BODY new">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="BODY new" font="Blacker Pro Display" fontStyle="Regular" size="9">As per the assessment of other fuel-based power plants, PDB expects 5,700MW from the installed coal capacity of 6,203MW and 3,500MW from the installed furnace oil capacity of 5,634MW.
</lang>
</p>
<p style=".Bodylaser" ul="0" ol="0"  orgstyle="SEE PAGE">
	<lang class="3" style=".Bodylaser" colour="#000000" orgstyle="SEE PAGE" font="Blacker Pro Display" fontStyle="Bold" size="7">SEE PAGE 2 COL 4</lang>
</p>

    </body.content>
  </body>
</nitf>