<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">#Title</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="160580" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="06/07/2022" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="291,670,709,1166" />
        <classifier id="Epaper-Build" value="7.60.0.0"/>
  <classifier id="ProcessingDateTime" value="Sat Jul 09 2022 08:05:38 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20220706T000000+5.30" edition.name="Main Edition" edition.area="MAI" position.section="DST06072212MAI-BACK" position.sequence="12" ex-ref="DST06072212MAI-BACK.indd" />
  </head>
  <body>
<body.head>
      <hedline>
    	<hl1 id="Headline1" class="1" style="Headline1">
		<lang class="3" style="Headline1"  font="Blacker Pro Display" fontStyle="Bold" size="15">BHULTA FLYOVER </lang>
	</hl1>
<hl2 id="Headline1" class="1" style="Headline2">
		<lang class="3" style="Headline2"  font="Blacker Pro Display" fontStyle="Bold" size="40">Poor planning jacked up cost by 47 percent </lang>
	</hl2>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
		<media-reference id="tn" source-credit="" data-location="1" source="ImageOfFrame5246_12_MAI_tn.jpg"  Units="pixels" width="50" height="50"></media-reference>
	</media>
</block>

     <p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Bold" size="8">TUHIN SHUBHRA ADHIKARY
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">About nine years back, the government approved a project to build a 613-meter-long four-lane flyover at Bhulta on Dhaka-Sylhet Highway to reduce traffic congestion and road crashes.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The project at Bhulta where Dhaka-Sylhet Highway crosses Dhaka Bypass Road was supposed to be completed by June 2015 at a cost of Tk 239.7 crore.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">When the Roads and Highways Department (RHD) moved to implement the project, it found that the flyover’s length was too short to be effective enough to help reduce tailback. And the project was revised accordingly in November 2016.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">But soon after the construction of the flyover started, the project was again revised in July 2018 as the RHD decided to construct another flyover on Dhaka Bypass Road for better traffic management. 
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">When the project was completed in July 2020, the cost stood at Tk 353.36 crore.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">“The project required 250 percent extra time and 47.36 percent additional funding to implement because the project was prepared on the basis of preliminary information, without feasibility study,” reads a IMED report.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">Implementation Monitoring and Evaluation Division (IMED) of Planning Ministry released the Impact Evaluation Study report recently.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">Time and cost overrun of development projects have become a major concern in recent times, with Prime Minister Sheikh Hasina on several occasions giving directives to stop the malpractice.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The Centre for Policy Dialogue (CPD) recently said the government is making significant investments in public infrastructure projects (PIPs), but a lack of good governance in project implementation undermines their efficiency.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The think tank identified weak feasibility studies, coordination failure, delays in land acquisition, and frequent changes of project directors as some of the key reasons behind the poor governance in PIPs implementation.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The Daily Star called RHD Chief AKM Manir Hossain Pathan over his mobile phone yesterday evening, but he didn’t pick up. Later, he sent a text message, saying he was sick.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Bold" size="9">BHULTA FLYOVER
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">Dhaka Bypass Road crosses the Dhaka-Sylhet Highway at Bhulta Bazar. Due to frequent movement of a large number of vehicles on both roads, the Bhulta Bazar area regularly saw long traffic congestions and the risk of accidents was also high, reads the IMED report. 
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">Considering this, the Executive Committee of the National Economic Council (ECNEC) in October 2013 approved the project to build a four-lane flyover though no feasibility study on the project was carried out, it mentioned.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The Development Project Proposal (DPP) was prepared on the basis of “preliminary information” but it was later found that the design of 613-meter-long flyover would not fulfil the project’s purpose. And the design was eventually changed.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">But immediately after the flyover’s construction began, its design had to be altered for a second time as the government decided to turn the Dhaka Bypass Road an access-controlled expressway.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">According to the new plan, two flyovers were constructed -- a 1,239-meter-long flyover on Dhaka-Sylhet Highway and a 611-meter-long flyover on Dhaka Bypass Road.
</lang>
</p>

<block id="subarticle1" style="subarticle" width="0" >

	<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Heavy" size="11">“It would have been possible to avoid increasing the time and cost of the project implementation if the correct design and DPP had been prepared following a feasibility study.” 
</lang>
</p>

	<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="10">Says IMED report.
</lang>
</p>
<hl2 id="Headline2" class="1" style="Headline2">
		<lang class="3" style="Headline"  font=""  size=""></lang>
</hl2>
</block>
    </body.content>
  </body>
</nitf>