<?xml version="1.0"?>
<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title"></title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="143912" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="03/03/2022" />
        <classifier id="PublicationName" value="DailyStar" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="kicker" value="" />
        <classifier id="ByLine" value="" />
        <classifier id="DateLine" value="" />
        <classifier id="box-geometry" value="239,498,709,914" />
        <classifier id="Epaper-Build" value="7.60.0.0"/>
  <classifier id="ProcessingDateTime" value="Thu Mar 03 2022 01:07:51 GMT+0600"/>
      </identified-content>

      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="DailyStar" date.publication="20220303T000000+5.30" edition.name="Main Edition" edition.area="MAI" position.section="DST03032202MAI-NEWS" position.sequence="2" ex-ref="DST03032202MAI-NEWS.indd" />
  </head>
  <body>
<body.head>
      <hedline>
    	<hl1 id="Headline1" class="1" style="Headline1">
		<lang class="3" style="Headline1"  font="Blacker Pro Display" fontStyle="Bold" size="39">Russia keen on funding three rail projects </lang>
	</hl1>

       </hedline>
</body.head>
    <body.content id="Bodytext" CaptionAsBody="0">
     <block>
	<media id="1" media-type="image">
			</media>
</block>

     <p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Bold" size="8">TUHIN SHUBHRA ADHIKARY
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">RZD International, a subsidiary of Russian Railways, has expressed interest to finance three proposed railway projects, including the much-talked-about high-speed rail line on the Dhaka-Chattogram corridor.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The company wants to finance and construct the project as well as those entailing the construction of the Panchagar-Banglabandha rail line and conversion of the Tongi-Bhairab Bazar-Akhaura track into a broad-gauge double line.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The offer was made on Tuesday by the Russian company’s local representatives, who met with officials of the railways ministry and Bangladesh Railway at the capital’s Rail Bhaban, officials involved with the proceedings told The Daily Star yesterday.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">RZD International was advised to come through the Economic Relations Division, which deals with foreign investment-related projects.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The development comes after BR sought Russian funding for five railway projects and placed a formal proposal at the third meeting of the Bangladesh-Russia Intergovernmental Commission on Trade, Scientific, Economic and Technical Cooperation (BR-IGC) held in December last year.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">However, the high-speed rail is the only project that exists in both the BR and the company’s proposals.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">If the deal goes through, it would be Russia’s first investment in Bangladesh’s railways sector. At present, Russia is funding the Rooppur nuclear power plant project.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Bold" size="9">RUSSIAN PROPOSAL</lang>
<lang  class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">RZD International’s first approach to BR was made in March last year and its local representatives held several meetings over the issue and settled on the three projects.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">And last month, Vladimir A Finov, the head of RZD International’s representative office in India, wrote a letter to Railways Minister Nurul Islam Sujan.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">Meinhardt Singapore and MGI Capital, the transaction advisory wing of Meinhardt Group, will work as RZD’s associates in implementing the projects, according to the letter.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Bold" size="9">THREE PROJECTS</lang>
<lang  class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">BR has already completed the feasibility study and detailed design of the high-speed railway project.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The estimated cost of the 224.64-kilometre-long rail route is $11.1 billion (Tk 93,350.9 crore).
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">However, Sujan last year said the government would go slow in implementing the project as it would require huge investment.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">BR is now carrying out the feasibility study for constructing a 48-km road between Panchagarh and Banglabandha Land Port, expected to boost regional connectivity.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">As per the draft study report, the cost of the project would be about Tk 3,200 crore, sources said.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">The existing line from Tongi via Bhairab to Akhaura is a metre-gauge double line and BR has already carried out a feasibility study to turn it into a dual-gauge line aiming to increase the capacity of the Dhaka-Chattogram rail corridor.
</lang>
</p>
<p style=".Bodylaser">
	<lang class="3" style=".Bodylaser" font="Blacker Pro Display" fontStyle="Regular" size="9">BR’s Director-General Dhirendra Nath Mazumder could not be reached over the phone, while Habibur Rahman, additional secretary of railways ministry, who led the ministry in absence of rail secretary at the meeting, declined to comment on the matter.
</lang>
</p>

    </body.content>
  </body>
</nitf>