﻿<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">&amp; çâÌæÚUæð´ ·¤è ¥ôÚU Îð¹Ùæ ÁæÚUè ÚU¹ð´ ¥ÍæüÌ ¥ÂÙð ÜÿØ ÂÚU ŠØæÙ ÚU¹ð´Ð ãæÚU Ù ×æÙð´, €UØô´ç·¤ ·¤æ× ·¤ÚUÙð âð ¥æÂ·¤ô ©gðàØ ·¤è Âýæç# ãôÌè ãñ ¥õÚU ÁèßÙ ·¤æ ¹æÜèÂÙ ÎêÚU ãôÌæ ãñÐ ÖÜð ãè ÁèßÙ ×ð´ ç·¤ÌÙè Öè ·¤çÆÙæ§ü €UØô´ Ù ¥æ°, çÁ™ææâæ ¥õÚU ©ˆâæã ÕÙæ° ÚU¹ð´Ð ŠØæÙ ÚU¹ð´, ÜÿØ ã×ðàææ ¥æÂ·Ô¤ Âæâ ãôÌð ãñ´ çÁ‹ãð´ ÂæÙð ·Ô¤ çÜ° ÂýØæâ ¥æÂ ·¤Öè Öè àæéM¤ ·¤ÚU â·¤Ìð ãñ´Ð</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="20220103" />
        <classifier id="PublicationName" value="Hindustan" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="IndexPage" value="" />
        <classifier id="box-geometry" value="-7,40,950,284" />
        <classifier id="Epaper-Build" value="Build-No: 2.1.0.9, Dated: 04/12/2021" />
        <classifier id="Application" value="QuarkXpress 8" />
        <classifier id="MachineName" value="TV0254" />
        <classifier id="ProcessingDateTime" value="Mon 03 Jan 2022 07:00:24" />
      </identified-content>
      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="Hindustan" date.publication="20220103T000000+5.30" edition.name="RPAjmCity" edition.area="RPAjmCity" position.section="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~" position.sequence="01" ex-ref="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~" SectionName="" />
  </head>
  <body>
    <body.head>
      <hedline>
        <hl1 id="kicker" class="1" style="Shoulder" MainHead="false">
          <lang class="3" style="kicker" font="Patrika18" size="12">Khalashpir Coal Mine Project
</lang>
        </hl1>
        <hl1 id="Headline" class="1" style="Headline" MainHead="true">
          <lang class="3" style="Headline" font="Patrika18" fontStyle="Bold" size="15">Hosaf's sketchy study raises questions
</lang>
        </hl1>
        <hl1 id="Subhead" class="1" style="Subhead" MainHead="true">
          <lang class="3" style="Subhead" font="Patrika18" fontStyle="Bold" size="15">Govt spends $95,000 for review of study by ex-consultant of Hosaf
</lang>
        </hl1>
        <hl1 id="Byline" class="1" style="Byline" MainHead="true">
          <lang class="3" style="Byline" font="Patrika18" fontStyle="Bold" size="15">Sharier Khan
</lang>
        </hl1>
      </hedline>
      <summary></summary>
      <quotes>
        <quote></quote>
      </quotes>
    </body.head>
    <body.content id="Bodytext">
      <block>
        <media id="1" media-type="image">
          <media-reference id="tn" source-credit="" data-location="1" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_720446704_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="2" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_720325568_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="3" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_720436736_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="4" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_715957792_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="5" ImgOrderNum="" source="03P1 StephenHawkings_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
        </media>
      </block>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The techno-economic feasibility study for Khalashpir coal mine project by Hosaf Consortium has finally been trashed by a Msreign consultant questioning the study’s scientific basis, methodology and raising a host of other questions, sources said.
</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">British consultant IMCL in the first of its kind review of a coal mine feasibility</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">study notes that there are fundamental geological issues regarding the Khalashpir deposit which the company must address before framing realistic and financially viable mining business plans.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The consultant found that Hosaf had done inadequate geological work and had deployed no accredited geologist for the job. Its study offered no detailed outline for environment or resettlement issues, and all these work should be done again</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">before submitting such a study report.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The IMCL, which used to be represented by Hosaf in Barapukuria coal mine project from the nineties and had worked for Hosaf in the same Khalashpir project a few years back, was appointed a few months ago for such a unique review through a tender floated during the last caretaker government's tenure. Interestingly, the Hydrocarbon Cell of the</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">SEE PAGE 2 COL 1 FROM PAGE 1</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">energy ministry that deals with oil and gas-related policy issues gave the appointment.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The cell last week made a presentation on the IMCL review to the energy secretary and formally submitted the full review to the ministry Sunday.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Khalashpir coal field was discovered by Geological Survey ofBangladesh (GSB) in 1989.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The then BNP-led alliance government on October 11, 2003, secretly gave Hosaf the licence to explore Khalashpir coal zone in 2,500 hectares of land. Hosaf applied for mining lease for the area in the same year for mine development.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Hosaf does not have mining experience.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The company in association with Shandong Ludi Xinwen Mining Group of China in July 2006 submitted the feasibility report to the Bureau of Minerals Development (BMD) with a plan to develop an underground mine. The report was prepared by China Jinan Mining Development Corporation engaged by Hosaf. During the study, Hosaf took help of Geotech-lndia, NamNam of North Korea, GeoMineral Engineering of China and IMCL</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Many officials and experts had then pointed out that the 1 fosaf study was a copy of that for Barapukuria coal mine project in which it acted as the local agent, questionably, for all the contractors involved.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">“The Techno Economic Feasibility Study was prepared</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">mainly on the basis of Geological Survey of Bangladesh's (GoB) geological reports published earlier and subsequent exploration work (no internationally acceptable standard was followed and the exploration activities were carried out without any kind of monitoring by the GoB),” one expert said.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The experts also questioned quality of the study and claimed that Hosaf had drilled only three boreholes to come to its conclusions. But the company claimed to have drilled 14 boreholes. Even Hosaf's own claims do not stand as a strong basis for such a study as the feasibility study of Asia Energy was done on the basis of 108 such holes.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Hosaf’s study remained shelved, but the BMD did not cancel its licence for Khalashpir coal zone. The caretaker government last year initiated the process of reviewing Hosaf s study through the Hydrocarbon Cell. The caretaker government had awarded several power contracts to enterprises owned by Hosaf chief Moazzem Hossain, who is an accused in the sensational corruption case concerning Barapukuria coal mine.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Some officials expressed surprise that the government spent about $95,000 to pay IMCL for reviewing a private company's feasibility study. "When Asia Energy submitted its study report, the. government formed a committee headed by Buet Professor Nurul Islam to review that</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">study. There was no cost involvement. But the Asia Energy study was much bigger and detailed that needed professional scrutiny. The Hosaf study is visibly a sketchy report,” noted an official.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Explaining why Hydrocarbon Cell was given such a job when it should have been done by the BMD, one source said, " BMD did not have enough funds to carry out a review. Hydrocarbon Cell had some Norwegian donation." IMCL observations</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Sources said IMCL in its review suggested that additional drilling should be carried out by a reputable and proven drilling contractor with modern and well-maintained equipment, who is qualified to operate in accordance with Joint Ore Reserve Committee (JORC), an internationally acceptable coal resource assessment code.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The review says previous boreholes that yielded unacceptable levels of core recovery should be re-drilled; an additional exploration must be carried out in accordance with internationally acceptable standards such as JORC utilising downhole geophysical logging in every hole as Hosaf drilled holes without logging: samples should be taken, logged and prepared as per JORC and supervised by a JORC- accredited senior geologist; analysis of collected samples should be undertaken by at least two accredit international laboratories observing</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">the standard rules of analysis.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">IMCL further says some coal samples indicate that coal at Khalashpir might have metallurgical coking properties and should be re-tested with fresh samples; underground mining would be preferred method of coal extraction particularly with respect to the surface environmental and social considerations; the Hosaf study's production design parameters are out of date with respect to current longwall technology, or inappropriate to meet the overall production targets; spontaneous combustion and air temperatures are likely to be the dominant underground environmental issues which interact, and it is to be reflected in the design process.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The company should have made environmental and social impact studies for construction, operation and mine closure stages, and the relevant department has to consult the local people to consider problems threatening the environment in and around the mine, thereviewsays.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Further professional studies are needed to address hydro-geological issues including hydraulic conductiv -ides and aquifer behaviours. There is no information about Acid Mine Drainage in the study, IMCL notes.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Mining subsidence impacts should be addressed during Environmental Impact Assessment (ELA) and engage the local population and all</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">stakeholders in open discussions to ensure that land owners and workers are fully informed at all stages of project development and implementation; the surface layout of the study is based on Barapukuria mine surface facilities. Many of these facilities are unnecessary, IMCLobserved.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">HosaTs study</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">In its study, Hosaf claimed that Khalashpir coal reserve occurs at depths between 257-480 metres with an estimated total reserve of 451 million tonnes--proven 277 m tonnes and indicated 174 m tonnes. Of the reserve, seam I, Il and IV are considered to have a potential for mining277 m tons.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Fhe IMCL review puts this estimate at 337 million tonnes for seam 1, II and IV, showing that Hosaf's assessment is grossly different.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Hosaf suggested underground mining with initial production target of two million tonnes a year, which would be raised to four million tonnes in the 1 Oth year of production.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Regarding underground mining risks and environmental impact assessment, the study said the spontaneous combustion and subsidence risks are high, including high methane emission and high underground mine temperature hazards. But it gave no details of management plans for the mining hazards and environment issues, stating 'proposed damage and hazards, reclamation plan etc have been duly undertaken.'</lang>
      </p>
    </body.content>
  </body>
</nitf>