﻿<!--<!DOCTYPE nitf SYSTEM "nitf-3-4.dtd">-->
<nitf>
  <head>
    <title id="Title">&amp; çâÌæÚUæð´ ·¤è ¥ôÚU Îð¹Ùæ ÁæÚUè ÚU¹ð´ ¥ÍæüÌ ¥ÂÙð ÜÿØ ÂÚU ŠØæÙ ÚU¹ð´Ð ãæÚU Ù ×æÙð´, €UØô´ç·¤ ·¤æ× ·¤ÚUÙð âð ¥æÂ·¤ô ©gðàØ ·¤è Âýæç# ãôÌè ãñ ¥õÚU ÁèßÙ ·¤æ ¹æÜèÂÙ ÎêÚU ãôÌæ ãñÐ ÖÜð ãè ÁèßÙ ×ð´ ç·¤ÌÙè Öè ·¤çÆÙæ§ü €UØô´ Ù ¥æ°, çÁ™ææâæ ¥õÚU ©ˆâæã ÕÙæ° ÚU¹ð´Ð ŠØæÙ ÚU¹ð´, ÜÿØ ã×ðàææ ¥æÂ·Ô¤ Âæâ ãôÌð ãñ´ çÁ‹ãð´ ÂæÙð ·Ô¤ çÜ° ÂýØæâ ¥æÂ ·¤Öè Öè àæéM¤ ·¤ÚU â·¤Ìð ãñ´Ð</title>
    <docdata management-doc-idref="">
      <date.issue id="CreationDate" norm="" />
      <du-key id="rev-ver" generation="1" version="Default" />
      <du-key id="Parent-Version" version="" />
      <identified-content>
        <classifier id="newspro-nitf" value="r2" />
        <classifier id="Newspro-App" value="Epaper" />
        <classifier id="Content-Type" value="Story" />
        <classifier id="storyID" value="" />
        <classifier id="CmsConID" value="" />
        <classifier id="Desk" value="" />
        <classifier id="Source" value="" />
        <classifier id="Edition" value="" />
        <classifier id="Category" value="-1" />
        <classifier id="UserName" value="" />
        <classifier id="PublicationDate" value="20220103" />
        <classifier id="PublicationName" value="Hindustan" />
        <classifier id="IsPublished" value="Y" />
        <classifier id="IsPlaced" value="Y" />
        <classifier id="IsCompleated" value="N" />
        <classifier id="IsProofed" value="N" />
        <classifier id="User" value="" />
        <classifier id="Headline-Count" value="" />
        <classifier id="Slug-Count" value="0" />
        <classifier id="Photo-Count" value="0" />
        <classifier id="Caption-Count" value="0" />
        <classifier id="Word-Count" value="0" />
        <classifier id="Character-Count" value="0" />
        <classifier id="Location" value="" />
        <classifier id="TemplateType" value="1" />
        <classifier id="StoryType" value="Story" />
        <classifier id="Author" value="" />
        <classifier id="UOM" value="mm" />
        <classifier id="IndexPage" value="" />
        <classifier id="box-geometry" value="-7,40,950,284" />
        <classifier id="Epaper-Build" value="Build-No: 2.1.0.9, Dated: 04/12/2021" />
        <classifier id="Application" value="QuarkXpress 8" />
        <classifier id="MachineName" value="TV0254" />
        <classifier id="ProcessingDateTime" value="Mon 03 Jan 2022 07:00:24" />
      </identified-content>
      <urgency id="home-page" ed-urg="0" />
      <urgency id="priority" ed-urg="0" />
      <doc-scope id="scope" value="0" />
    </docdata>
    <pubdata type="print" name="Hindustan" date.publication="20220103T000000+5.30" edition.name="RPAjmCity" edition.area="RPAjmCity" position.section="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~" position.sequence="01" ex-ref="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~" SectionName="" />
  </head>
  <body>
    <body.head>
      <hedline>
        <hl1 id="kicker" class="1" style="Shoulder" MainHead="false">
          <lang class="3" style="kicker" font="Patrika18" size="12">
</lang>
        </hl1>
        <hl1 id="Headline" class="1" style="Headline" MainHead="true">
          <lang class="3" style="Headline" font="Patrika18" fontStyle="Bold" size="15">Moon ride on Dhaka roads
</lang>
        </hl1>
        <hl1 id="Subhead" class="1" style="Subhead" MainHead="true">
          <lang class="3" style="Subhead" font="Patrika18" fontStyle="Bold" size="15">Dug-up, ill-repaired streets go from bad to worse in the rains
</lang>
        </hl1>
        <hl1 id="Byline" class="1" style="Byline" MainHead="true">
          <lang class="3" style="Byline" font="Patrika18" fontStyle="Bold" size="15">Helemul Alam
</lang>
        </hl1>
      </hedline>
      <summary></summary>
      <quotes>
        <quote></quote>
      </quotes>
    </body.head>
    <body.content id="Bodytext">
      <block>
        <media id="1" media-type="image">
          <media-reference id="tn" source-credit="" data-location="1" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_720446704_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="2" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_720325568_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="3" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_720436736_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="4" ImgOrderNum="" source="03012022-RPAjmCity-01-PAGE-03012022_RPAjmCity_01~WS4~_SubGroupImage_715957792_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
          <media-reference id="tn" source-credit="" data-location="5" ImgOrderNum="" source="03P1 StephenHawkings_tn.JPG" Units="pixels" width="50" height="50"></media-reference>
          <media-caption id="Caption1" font="">
            <hl2></hl2>
          </media-caption>
        </media>
      </block>
      <p style=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Poor road conditions, delayed repairs and continuous road diggings have left many residents suffering at different places around the city.
</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Road works completed after digging up roads, and then filled back, have been left without complete repairs, adding to the misery of commuters.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The monsoon rains, as every other year, have made the dug up roads risky for commuting. The number of accidents on such roads has also increased, as has</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">traffic congestion in the same areas.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Busy roads at Jurain, Postogola (near Postogola Buriganga Bridge), Basabo, Madartek, Mir Hajirbagh, Babu Bazar, Islambagh, Lalbagh, Mirpur section-11, Kazipara, Barobagh, Manipur and Karwan Bazar are in extremely poor condition.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">On one hand dilapidated roads pose risks to commuters and on die other, different utility service agencies including WASA have also been busy digging up different roads even with the onset of the monsoons.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Adding to this is the roads which were dug up some five months back for works and have since not been re-carpeted. These include Dinnath Sen Road and Rajanikanth Road at Gendaria.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The DCC has also left roads in Mohammadpur -- including the very busy Tajmahal Road -- without recarpeting.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">DCC, which collects a digging fee from companies, which dig up the road for works, is supposed to re-carpet the roads once work is completed and the dug up roads filled again. Experts say that delays by DCC lead to the easy damage of roads as they are left in vulnerable conditions without any carpeting for heavy vehicles to ply on them. Rains only expedite the damage.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The road near the first Bunganga Bridge at Postogola is in extremely bad condition.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">On Sunday, a truck carrying bricks from Rajendrapur — ironically to repair the road on a temporary basis -- overturned on a large pothole. Such accidents are a regular phenomenon in the area, residents say.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Md Zakir, a driver of Silk City - a bus running regular shuttles on the Jatraban • ► Mirpur route -- had a similar experience on the same road. He said that around Tk 1200 is spent on various minor repairs on his vehicle almost within every three days because of the damage cause by the bumpy roads.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Jahangir, owner of Bikrampur Pharmacy near the road, said he witnesses around 10 accidents on this road daily, all caused by the large potholes. Rickshaws, cars, buses and trucks fall alike into the potholes injuring passengers.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Haji Mohammad Osman Gani, president of the Dhaka Zila TYuck Malik Samity, said around 12 trucks had accidents because of the large potholes on the roads in the fast one month.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">It costs around Tk 3000 to 4000 to hire other vehicles to pull up one single truck from there, ne said.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Sub-divisional engineer of sub-division-2 of Roads and Highway Department Nur Hossain said they have already started repair works in the area and are now filling up the potholes with a sub-oase of * Orick chips and sand. A thicker layer of bricks would be laid atop this, he said.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">"This is a temporary repair of the road. When we repair it on a permanent basis, we will seal mis with a layer of bitumen," he said.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Nur said lack of a drainage system led to the logging of water here that flows from Jurain rail gate and Postogola Bridge. This w'ater logging damage the road rapidly.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">"We need to set up a drainage line connecting to Buriganga River, but the unavailability of necessary land through which to build this drain stops us," hesaid.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Sub-assistant engineer of Munishiganj division Md Firoz /Mam also said that a drainage line is needed from Postogola to Postogola Shenanibash near the bridge linking Buriganga Bridge to stop the rainwater from accumulating there.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Waterlogging is the main cause behind damage of roads repaired only last year, he said.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">The road from Basabo Flyover to Nandipara has been in a desperate condition for the last two and a half years, said resident of Madartek Mamun.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Mir Hajirbagh Road, which was repaired only three years ago has also been damaged at several points, said another resident.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Dinnath Sen Road and Rajanikanth Road, dug up around five months ago to set a storm sewerage line in the area, still await repair though WASA completed its job three monthsago.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Mokhlesur Rahman, a resident of Shatish Sarkar Road in Gendaria, said locals are astonished at the extent of negligence by authorities concerned who are yet to attend to the roads dug up five monthsago.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">These roads were in good condition before that, he said.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">Meanwhile, fresh diggings have started at different points of the city including Karwan Bazar, Moghbazar Wireless Rail gate to Nayatola-Modhubagh and Distillery Road in Gendaria -- all causing huge suffering to the residents.</lang>
      </p>
      <p class=".Bodylaser">
        <lang class="3" style=".Bodylaser" font="Patrika15 Ultra" fontStyle="Bold" size="130">DCC Mayor Sadeque Hossain KhoKa. when contacted, said they would take immediate steps to repair the dug up roads. He also said that repair of dilapidated roads would be taken up soon.</lang>
      </p>
    </body.content>
  </body>
</nitf>